Connect With Us
After six weeks of working at IBM, I was assigned as the lead server admin for a corporate wide project called The PEZ Deployment. This deployment consisted of over 200 servers to be built, configured, and shipped off to various Washington Mutual remote branch bank sites. This complex setup required me to assemble IBM x345 and x360 Series servers with various components.
Close